Lelystad Airport, Netherlands

Lelystad Airport required a number of solutions to control passenger flow in and out of the airport, ahead of their opening.

Requirements

JLC were required to install a set of three boarding gates and two sets of one way corridors. This enabled Lelystad to manage incoming and outgoing passenger flow at various locations through the airport.

Outcome

The project was completed on budget and on time, enabling Lelystad to prepare for Airport opening in due course.